| Ground Level Signalling System |
 
There is an ongoing project to upgrade the ground level signal box, which includes installing a fully working lever controlled signalling system and renovation of the structure.
 
Replacing the Window.
 
Jonathan Working on Window
Due to the non-standard size, club member Jonathan (seen above) made the window from scratch,
which was brought to the park in pieces and assembled in the station.
 
On Sunday 3rd October 2004 a work party removed the old window
and the new window installed.
Removing Old Window
Removing the glass.
 
Removing the Frame
Finishing removal of the old frame.
 
The New Window
The new frame coming out of the Station.
 
Final Preperation
Final preparation of the new frame before installing.
 
Fitting the New
Installing the new frame.
 
Up Arrow
 
Fixing to Structure
Securing the frame to the brickwork.
 
Fixing
The final fixing goes in.
 
In Place and Fixed
The new window in place, because Jonathan made the window such a good fit
very little work will be needed to seal the frame to the brickwork.
The windows were not glazed immediately as the signal lever frame (a very heavy unit)
is going to be installed by passing it through the frame.
 
Progress on the Window
The 31st October 2004, showing progress on the window.
 
Signal Box with Shutters
Seen here on the 21st November 2004 with the metal shutters in place.