| Ground Level Track Signal Box at Ridgeway Park |
| | Return to Main Picture Galley Page | |
| | Ground Level Signalling System | |
| There is an ongoing project to upgrade the ground level signal box, which includes installing a fully working lever controlled signalling system and renovation of the structure. |
| Replacing the Window. |
![]() |
| Due to the non-standard size, club member
Jonathan (seen above) made the window from scratch, which was brought to the park in pieces and assembled in the station. |
| On Sunday 3rd October 2004 a work party removed
the old window and the new window installed. |
![]() |
| Removing the glass. |
![]() |
| Finishing removal of the old frame. |
![]() |
| The new frame coming out of the Station. |
![]() |
| Final preparation of the new frame before installing. |
![]() |
| Installing the new frame. |
![]() |
| Securing the frame to the brickwork. |
![]() |
| The final fixing goes in. |
![]() |
| The new window in place, because Jonathan made
the window such a good fit very little work will be needed to seal the frame to the brickwork. The windows were not glazed immediately as the signal lever frame (a very heavy unit) is going to be installed by passing it through the frame. |
![]() |
| The 31st October 2004, showing progress on the window. |
![]() |
| Seen here on the 21st November 2004 with the metal shutters in place. |
| -0- |
| |
| | Main Picture Gallery | Home Page | Club Projects Page | |
| © Chingford & District Model Engineering Club 2005 |
| -0- |